Method for producing piezoelectric multi-layered components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10686121
APP PUB NO 20180006209A1
SERIAL NO

15547055

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for producing piezoelectric multi-layered components (2), which comprises the following steps: applying an electrode material (5) to green sheets (3) containing a piezoelectric material, applying a layer of a first auxiliary material (9) to at least one green sheet (3) containing the piezoelectric material, forming a stack (1), in which the green sheets (3), to which electrode material (5) is applied, are arranged one on top of another, wherein at least one ply of the green sheet (3), to which the layer of the first auxiliary material (9) is applied, is arranged in the stack (1), sintering the stack (1), wherein the layer of the first auxiliary material (9) is thinned, and firing the stack (1), wherein the stack (1) is singulated along the at least one ply into at least two multi-layered components (2).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TDK ELECTRONICS AGROSENHEIMER STR 141E MUENCHEN 81671

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ottlinger, Marion Deutschlandsberg, AT 19 49
Windisch, Peter Deutschlandsberg, AT 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00