Iron-based oxide magnetic particle powder, method for producing same, coating material, and magnetic recording medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10622127
APP PUB NO 20180005737A1
SERIAL NO

15541505

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An iron-based oxide magnetic particle powder has a narrow particle size distribution a small content of fine particles that do not contribute to magnetic recording characteristics, and a narrow coercive force distribution, to enhance magnetic recording medium density. Neutralizing an aqueous solution containing a trivalent iron ion and an ion of the metal substituting a part of the Fe sites by adding an alkali to make pH of 1.5 or more and 2.5 or less, adding a hydroxycarboxylic acid, and further neutralizing by adding an alkali to make pH of 8.0 or more and 9.0 or less are performed at 5° C. or more and 25° C. or less. A formed iron oxyhydroxide precipitate containing the substituting metal element is rinsed with water, then coated with silicon oxide, and then heated thereby providing e-type iron-based oxide magnetic particle powder. The rinsed precipitate may be subjected to a hydrothermal treatment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOWA ELECTRONICS MATERIALS CO LTDTOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawahito, Tetsuya Tokyo, JP 9 46
Sakane, Kenji Tokyo, JP 40 1127

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00