Method for producing a flexographic printing frame through multiple exposures using UV LEDS

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10175580
APP PUB NO 20180004093A1
SERIAL NO

15536565

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing flexographic printing plates. The method has the following steps:

    (a) producing a mask by imaging the digitally imagable layer,(b) exposing the photopolymerizable, relief-forming layer through the mask with actinic light, and photopolymerizing the image regions of the layer, and(c) developing the photopolymerized layer by washing out the unphotopolymerized regions of the relief-forming layer with an organic solvent, or by thermal development, whereinstep (b) contains at least two exposure cycles with actinic light with an intensity of 100 to 5000 mW/cm2 from a plurality of UV-LEDs, the energy input into the photopolymerizable, relief-forming layer per exposure cycle being 0.1 to 5 J/cm2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XSYS GERMANY GMBH77731 WILLSTATT

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beyer, Matthias Pfinztal, DE 24 89
Fronczkiewicz, Peter Lake Wylie, US 3 16
Wendland, Thorben Renningen, DE 1 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 8, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 8, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00