Aggregated pulse phase difference torque determination system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10267691
APP PUB NO 20180003578A1
SERIAL NO

15432556

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method determines torque applied to a rotating shaft by a load. Two sensors determine the rotation of the shaft at two spaced-apart axial positions. Controller(s) analyze two pulse trains associated with signals received from the sensors corresponding to rotation of the shaft at the respective axial positions under the load. The controller(s) determine a delta phase value for each pulse of one pulse train with respect to a corresponding pulse of another pulse train, and aggregate each delta phase value for a prescribed period of pulses to determine an aggregate delta phase value. The controller(s) determine a load phase value as a ratio of the aggregate delta phase value to the prescribed period, a total delta phase value as a difference between the load phase value and a reference phase value, and a torque value from the load based on the total delta phase value and physical parameters of the shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE GLOBAL INTELLECTUAL PROPERTY SERVICES MOLINE IL 61265

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Leonard, Jared F Evansdale, US 1 7
White, Robert J Waterloo, US 22 448

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00