Air conditioning device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10184683
APP PUB NO 20180003419A1
SERIAL NO

15543775

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-type air conditioning device controls an evaporation temperature and a condensing temperature, depending on required capacity of an indoor unit. The air conditioning device compares a current evaporation temperature or condensing temperature with a reference value, of an evaporation temperature or an condensing temperature, corresponding to a lower limit flow rate, of a gaseous refrigerant, required for refrigerating machine oil not to accumulate in, but to flow through, the gas branch pipes, and calculates an amount of the refrigerating machine oil accumulated in a gas branch pipe which does not satisfy the lower limit flow rate. When the calculated amount exceeds a set amount, the air conditioning device performs oil collecting operation, and controls the oil collecting operation in view of a flow rate of a gaseous refrigerant in gas branch pipes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIKIN INDUSTRIES LTDOSAKA CITY OSAKA OF JAPAN OSAKA-SHI OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Minami, Junya Osaka, JP 19 29
Ohura, Ryuuta Osaka, JP 11 22
Oka, Yuusuke Osaka, JP 14 83

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 22, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 22, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00