Rolling of rolling material with tension change at the rolling of the tail end of the rolling material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10618091
APP PUB NO 20180001362A1
SERIAL NO

15540525

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

During rolling of front sections of rolling material in a rear group of roll stands of a rolling mill, rear sections of the rolling material are rolled in the front group of roll stands. A run-out speed with which the rolling material is exiting the front group of roll stands is detected. A run-in speed with which the rolling material is entering the rear group of roll stands is detected. A rolling speed with which the rear group of roll stands is driven is controlled by a controller such that a relation of the run-in speed to the run-out speed equals a predetermined value. The predetermined value is kept constant until a time point at which a tail end of the rolling material reaches a predetermined location upstream of the front group of roll stands, and is changed according to a predetermined function after the time point.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRIMETALS TECHNOLOGIES GERMANY GMBHBUNSENSTRASSE 43 ERLANGEN 91058

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Justen, Cristiano Shrewsbury, US 1 0
Ling, Yun Shrewsbury, US 46 525
Riches, Paul Barry Paxton, US 8 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00