Defibrillator that monitors CPR treatment and adjusts protocol

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11389660
APP PUB NO 20180001098A1
SERIAL NO

15583038

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus and method is provided for a defibrillator that specifies treatment protocols in terms of number of chest compressions instead of time intervals. The defibrillator includes a connection port that is configured to attach with a plurality of electrodes that are capable of delivery of a defibrillation shock and/or sensing one or more physical parameters. An energy storage device capable of storing a charge is attached to the plurality of electrodes. A controller is coupled to the plurality of electrodes and the energy storage device, the controller is configured to provide CPR chest compression instructions in terms of the numbers of CPR chest compressions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PHYSIO-CONTROL INC11811 WILLOWS ROAD NE REDMOND WA 98052

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chapman, Fred Newcastle, US 22 152
Stickney, Ronald Eugene Edmonds, US 15 234
Walker, Robert G Seattle, US 107 1262

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00