Streamer manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10613241
SERIAL NO

15615277

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a streamer section. The method includes coupling together a plurality of prefabricated harness modules. A harness module includes a plurality of geophysical sensors disposed along a length of the harness module and a sensor node communicatively coupled to the plurality of sensors. A first connector is disposed at a first end of the harness module and a second connector disposed at a second end of the harness module. The first connector is coupled to the sensor node and is configured to couple to a second harness module and receive data from a sensor node in the second harness module. The second connector is coupled to the sensor node and is configured to couple to a third harness module and forward data to a sensor node in the third harness module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PGS GEOPHYSICAL ASSTRANDVEIEN 4 N-1366 LYSAKER

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Drange, Geir Andre Motzfeldt Oslo, NO 19 64
Finnøen, Bengt Oslo, NO 3 0
Hillesund, Øyvind Oslo, NO 25 125
Traetten, Oeystein Oslo, NO 12 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00