Engine aft section structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10830180
APP PUB NO 20170370327A1
SERIAL NO

15671788

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aft section structure of a jet engine with an axis is comprised of a casing defining a duct around the axis and opened axially fore and aft; a cone tapering aftward at a first angle with the axis and having a pointed end; guide vanes, each of the vanes radially extending from the cone to the casing and comprising a pressure side at a second angle with a plane containing the axis; spray bars, each of the spray bars extending radially within the duct and comprising trailing sides, each of the trailing sides being directed aftward at a third angle with a plane containing the axis; and flame holders, each of the flame holders extending radially within the duct and comprising one or more interior sides, each of the interior sides being directed aftward at a fourth angle with a plane containing the axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IHI CORPORATIONKOTO-KU TOKYO 135-8710

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hosoi, Jun Tokyo, JP 11 61
Takahashi, Katsuyoshi Tokyo, JP 33 111
Tanaka, Shinji Tokyo, JP 329 3474

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 10, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00