Method for manufacturing a preform made of woven reinforcement fibers having a variable cross-section

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10746046
APP PUB NO 20170370247A1
SERIAL NO

15672638

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a method for manufacturing a preform made of reinforcement fibers woven in a longitudinal direction. The preform is impregnated with resin in order to form an elongated element having a variable transverse cross-section. In one form, the method includes the step of simultaneously including a reduction (or increase) in width and an increase (or reduction) in height. The variable cross-section includes, along the length thereof, a consistent number (c) of continuous warp threads arranged in layers. The method for reducing width includes carrying out a change in weave, adding additional weft threads, and simultaneously drawing the teeth of the longitudinal beater reed closer together so as to increase the number of layers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN NACELLESROUTE DU PONT VII GONFREVILLE-L'ORCHER 76700

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Desjoyeaux, Bertrand Sainte Adresse, FR 57 178
Louchard, Sébastien Le Havre, FR 7 14
Marical, Arnaud Quilleboeuf sur Seine, FR 1 4
Provost, Benjamin Montivillers, FR 17 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00