Integrating nanopore sensors within microfluidic channel arrays using controlled breakdown
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jul 21, 2020
Grant Date -
Dec 21, 2017
app pub date -
Dec 18, 2015
filing date -
Dec 19, 2014
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
Nanopore arrays are fabricated by controlled breakdown in solid-state membranes integrated within polydimethyl-siloxane (PDMS) microfluidic devices. This technique enables the scalable production of independently addressable nanopores. By confining the electric field within the microfluidic architecture, nanopore fabrication is precisely localized and electrical noise is significantly reduced during sensing.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
THE UNIVERSITY OF OTTAWA | OTTAWA ONTARIO K1N 6N5 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Beamish, Eric | Ottawa, CA | 3 | 17 |
# of filed Patents : 3 Total Citations : 17 | |||
Godin, Michel | Ottawa, CA | 9 | 82 |
# of filed Patents : 9 Total Citations : 82 | |||
Tabard-Cossa, Vincent | Ottawa, CA | 9 | 50 |
# of filed Patents : 9 Total Citations : 50 | |||
Tahvildari, Radin | Ottawa, CA | 2 | 3 |
# of filed Patents : 2 Total Citations : 3 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- G01N Class
- 0 % this patent is cited more than
- 5 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jan 21, 2028 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jan 21, 2032 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
