Process for producing tyres

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10668679
APP PUB NO 20170361555A1
SERIAL NO

15537873

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing tyres including building a green tyre having two bead structures. Each bead structure includes a bead filler. The bead filler or another rigid component of the green tyre includes a final elastomeric compound produced by the following: feeding elastomeric polymer and reinforcement filler to a first batch mixing device; mixing and dispersing the reinforcement filler in the elastomeric polymer and unloading the obtained elastomeric compound; feeding the obtained elastomeric compound, along with at least 5 phr of reinforcement resin, to a continuous mixing device of intermeshing and co-rotating twin-screw or multi-screw type or of planetary type; mixing the reinforcement resin in the elastomeric compound and unloading the obtained elastomeric compound; and feeding the obtained elastomeric compound along with the components capable of facilitating the cross-linking to a second batch mixing device and mixing to obtain the final elastomeric compound. The first and second batch mixing device have two counterrotating rotors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PIRELLI TYRE S P AVIALE PIERO E ALBERTO PIRELLI 25 20126 MILANO 20126

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Cancellis Pierluigi Milan, IT 9 79
Prandini, Elena Milan, IT 1 3
Scurati, Alberto Milan, IT 8 102

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00