Systems and methods for manufacturing a stent frame

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11395751
APP PUB NO 20170360585A1
SERIAL NO

15645937

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A prosthetic heart valve can include a support structure, an actuator member, and a plurality of leaflets. The support structure can have a plurality of struts and a plurality of rivets. The struts can have openings formed therein. The rivets can have first portions and second portions. The first portions can extend through the openings of the struts, and the second portions are larger than the first portion and the openings of the struts. The struts are pivotable about the rivets to radially expand and compress the support structure. The actuator member can be coupled to the struts of the support structure and configured to selectively actuate expansion and compression of the support structure. The leaflets can be coupled to the support structure and configured to allow unidirectional blood flow through the prosthetic heart valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EDWARDS LIFESCIENCES CARDIAQ LLCONE EDWARDS WAY IRVINE CA 92614

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
White, Jennifer K Charlestown, US 22 1880

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 26, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 26, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 26, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00