Method of identifying when to initiate control sequences

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10910873
APP PUB NO 20170358946A1
SERIAL NO

15179500

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system are provided for transferring a load between a primary power source and a secondary power source. In accordance with the disclosure, a controller senses, via a sensor, an electrical signal providing power from the primary power source to the load. The controller also detects a non-conforming power event by determining that a parameter of the electrical signal is either more or less than a first threshold value. Responsive to the detection of the non-conforming power event, the controller determines a quantity of non-conforming power events that occur during a first time interval. The controller further can compares the determined quantity of non-conforming power events to a second threshold value. Responsive to the determined quantity of non-conforming power events being either greater or lesser than the second threshold value, the controller initiates a control signal, such as a control signal to initiate a load transfer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASCO POWER TECHNOLOGIES L P50 HANOVER ROAD FLORHAM PARK NJ 07932

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bonachea, Victor E Elmwood Park, US 14 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00