Evaporated fuel treatment device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10934976
APP PUB NO 20170356394A1
SERIAL NO

15539207

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An evaporated fuel treatment device is provided with an electric-operated valve, a positive-pressure relief valve mechanism and a negative-pressure relief valve mechanism. The electric-operated valve has a valve body for opening/closing a vapor passage allowing a fuel tank and a canister, and adjusts the flow rate by electrical control. The positive-pressure relief valve mechanism opens when the pressure at the fuel tank side has a value greater than or equal to a predetermined positive pressure value. The negative-pressure relief valve mechanism opens when the pressure at the fuel tank side has a value less than or equal to a predetermined negative pressure value. The electric-operated valve is configured such that the valve body is moved in the valve opening direction by the pressure at the fuel tank side that is higher, by a predetermined value, than the valve opening pressure for the positive-pressure relief valve mechanism.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AISAN KOGYO KABUSHIKI KAISHA1-1 KYOWA-CHO 1-CHOME OBU-SHI AICHI 4748588 ?4748588

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Murai, Shinji Obu, JP 104 952

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00