Method for manufacturing a panel including a reinforcement sheet, and a floor panel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10828879
APP PUB NO 20170355180A1
SERIAL NO

15527564

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a panel including a reinforcement sheet having the steps of: providing a first layer of thermoplastic material, providing a reinforcement sheet, laying the reinforcement sheet and the first layer onto each other, applying a second layer of thermoplastic material on top of the reinforcement sheet at a side facing away from the first layer, at least partially melting the thermoplastic materials of the first layer and the second layer, adhering the at least partially melted first layer, the at least partially melted second layer and the reinforcement sheet to each other so as to form the panel. Additionally, the reinforcement sheet and the first layer are adhered to each other by pressing them together after at least partially melting the thermoplastic material of the first layer, but before applying the second layer of thermoplastic material onto the reinforcement sheet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNILIN BVOOIGEMSTRAAT 3 WIELSBEKE 8710

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bossuyt, Filip Gilbert Lucien Avelgem, BE 8 60
Van, Vlassenrode Kristof Deinze, BE 51 111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 10, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00