Method for manufacturing wiring board

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10674615
APP PUB NO 20170354044A1
SERIAL NO

15609435

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a wiring board includes preparing a core substrate having first and second surfaces, forming a first build-up structure including interlayer insulating layers and conductor layers on the first surface of the substrate, and forming a second build-up structure including interlayer insulating layers and one or more conductor layers on the second surface of the substrate. The forming of the first structure includes laminating the insulating layers and metal layers on first surface side of the substrate and forming the conductor layers from all of the metal layers on the first surface side, and the forming of the second structure includes laminating the insulating layers and metal layers on second surface side of the substrate, forming the one or more conductor layers from one or more of the metal layers on the second surface side, and entirely removing the other metal layers on the second surface side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IBIDEN CO LTDOGAKI-SHI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kurahashi, Naoki Ogaki, JP 4 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00