Control method for a system comprising a frequency converter connected to a power grid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10749343
APP PUB NO 20170353036A1
SERIAL NO

15527257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method which is suitable for a system having a frequency converter and a generator, both of which are connected to a power grid, includes obtaining sub-synchronous components of the grid voltage and determining damping current set points according to the sub-synchronous components to compensate for sub-synchronous resonances of the grid. Damping current set points are determined by receiving the sub-synchronous components of the grid voltage and returning damping current set points as outputs. A variable damping gain is adjusted according to the sub-synchronous frequency of the grid, such that the required compensation level can be adapted to the frequency converter for damping sub-synchronous resonance of the grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INGETEAM POWER TECHNOLOGY S A48170 ZAMUDIO (BIZKAIA)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gil, Lizarbe Beatriz Sarriguren, ES 1 12
Girones, Remirez Carlos Sarriguren, ES 3 16
Sanz, Ceballos Eduardo Zamudio, ES 2 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00