System and method for predictive curation, production infrastructure, and personal content assistant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11429832
APP PUB NO 20170352083A1
SERIAL NO

15611378

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein is a system and method for predictive curation, and production infrastructure. In certain embodiments, the system includes a user interface, which may take the form of a “virtual curator,” a graphical or animated persona for augmenting and managing interactions between the user and the system managing the user's stored media assets. The virtual curator can assume one of many personas, as appropriate, with each user. Embodiments of the system leverage data points, calendar entries, trends, behavioral patterns to predict and pre-emptively build digital and printable products with selected collections of images without the user's active participation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KODAK ALARIS LLC1209 ORANGE STREET CORPORATION TRUST CENTER WILMINGTON DE 19801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Das, Madirakshi Penfield, US 47 2300
Kloosterman, David Penfield, US 16 257
Loui, Alexander C Penfield, US 129 5346
Manico, Joseph A Rochester, US 269 6675
Ruck, Kenneth New York, US 2 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00