Optical circuit module, optical transceiver using the same, and semiconductor photonic device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10151877
APP PUB NO 20170351024A1
SERIAL NO

15607957

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical circuit module comprises a substrate with a first optical coupler connected to a first optical waveguide and a second optical coupler connected to a second optical waveguide on a substrate surface side; and a semiconductor photonic device mounted on the substrate, wherein the semiconductor photonic device has a third optical waveguide and a fourth optical waveguide extending to a first end face that faces the substrate surface, and wherein the third optical waveguide is optically connected to the first optical coupler and the fourth optical waveguide is optically connected to the second optical coupler.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJITSU LIMITED1-1 KAMIKODANAKA 4-CHOME NAKAHARA-KU KAWASAKI-SHI KANAGAWA 2118588 ?2118588
PHOTONICS ELECTRONICS TECHNOLOGY RESEARCH ASSOCIATION20-10 SEKIGUCHI 1-CHOME BUNKYO-KU TOKYO 112-0014

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayakawa, Akinori Sagamihara, JP 17 207

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00