Unit, device and system for preparing beverage consumptions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10893773
APP PUB NO 20170347829A1
SERIAL NO

15621784

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The beverage preparation unit comprises a mixing chamber having a beverage outlet, a liquid flow path for supplying a liquid to the mixing chamber, and an air flow path for supplying air to the liquid flow path. The mixing chamber is arranged for receiving a beverage related ingredient, such as concentrate, preferably from an exchangeable supply pack. The liquid flow path is arranged for generating a hollow jet of liquid having an outer liquid portion extending in a flow direction of the jet and an inner air portion extending in a flow direction of the jet wherein the outer liquid portion surrounds the inner air portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KONINKLIJKE DOUWE EGBERTS B VVLEUTENSEVAART 35 3532 AD UTRECHT NETHERLANDS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dees, Hendrik Johan Utrecht, NL 24 60
Klabbers, Bram Utrecht, NL 7 24
Rutten, Mathias Antonius Fransiscus Utrecht, NL 4 22
Standaar, Koen Utrecht, NL 18 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 19, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 19, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00