Dynamic network load regulating device and method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10142238
APP PUB NO 20170346739A1
SERIAL NO

15252235

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dynamic network load regulating device includes a first network bridge, a second network bridge, a third network bridge, and a traffic monitoring module. The second network bridge and the third network bridge are further coupled to a plurality of terminal devices. Each of the network bridges includes a plurality of ports. The traffic monitoring module is configured to monitor the plurality of ports traffic load. When a first data transmission path traffic load reaches a congestion threshold, the dynamic network load regulating device increases the first data transmission path cost to select a second data transmission path to transmit network data. A method for the dynamic network load regulating device is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANNING FUGUI PRECISION INDUSTRIAL CO LTDNO 5 WORKSHOP PHASE III CHINA ASEAN ENTERPRISE HEADQUARTERS BASE NO 18 HEADQUARTERS ROAD HIGH TECH ZONE NANNING GUANGXI 530007 NANNING CITY THE GUANGXI ZHUANG AUTONOMOUS REGION 530007

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lai, Yi-Ting New Taipei, TW 23 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 27, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 27, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00