Torque estimating device of gas compressor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10107704
APP PUB NO 20170343445A1
SERIAL NO

15534777

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A torque estimating device of a gas compressor includes a reference torque characteristic storage unit that stores a reference torque characteristic of the gas compressor as a torque characteristic of the gas compressor in a specific operation state, a torque setting unit that sets a torque corresponding to an input speed of rotation of the gas compressor and pressure of a refrigerant discharged from the gas compressor, on the basis of the reference torque characteristic stored in the reference torque characteristic storage unit, and a torque correcting unit that sets a torque at startup of the gas compressor among the torques set by the torque setting unit, by correcting the torque set by the torque setting unit, in accordance with the speed of rotation and an elapsed time from startup.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CALSONIC KANSEI CORPORATIONSAITAMA-SHI SAITAMA 331-8501

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Satou, Keita Saitama, JP 9 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00