Plate width control device for material to be rolled

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10668514
APP PUB NO 20170341117A1
SERIAL NO

15534167

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plate width control device capable of improving the precision of the width of a material to be rolled is provided. In a rolling system, a plate width control device includes an arithmetic unit calculating an estimated value of a deviation amount of the width of the material to be rolled in the vertical rolling mill, and calculating an estimated value of an expansion amount of the width of the material to be rolled when a head end of the material to be rolled is caught in the horizontal rolling mill, and a control unit controlling a gap amount of the vertical rolling mill such that the deviation amount of the width of the material to be rolled is eliminated, and compensating for the gap amount of the vertical rolling mill when the head end of the material to be rolled is caught in the horizontal rolling mill.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TMEIC CORPORATION1-1 KYOBASHI 3-CHOME CHUO-KU TOKYO 104-0031

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tachibana, Minoru Tokyo, JP 33 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00