Flue gas treatment system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10328383
APP PUB NO 20170341014A1
SERIAL NO

15533460

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wet desulfurization apparatus which removes sulfur oxides in flue gas from a boiler 11 includes a mist collection/agglomeration apparatus which is provided on a downstream side of the desulfurization apparatus and forms agglomerated SO3 mist by causing particles of SO3 mist contained in flue gas 12B from the wet desulfurization apparatus to be bonded together and have bloated particle sizes; a CO2 recovery apparatus constituted by a CO2 absorption tower having a CO2 absorption unit which removes CO2 contained in flue gas by being brought into contact with a CO2 absorbent and an absorbent regeneration tower which recovers CO2 by releasing CO2 from the CO2 absorbent having absorbed CO2 and regenerates the CO2 absorbent; and a mist collection unit which collects CO2 absorbent bloated mist bloated by the CO2 absorbent being absorbed by the agglomerated SO3 mist in the CO2 absorption unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTDKANAGAWA KANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirata, Takuya Tokyo, JP 97 531
Kato, Masaya Hyogo, JP 80 540
Nagayasu, Hiromitsu Tokyo, JP 56 403
Noborisato, Tomoki Tokyo, JP 7 12
Tanaka, Takao Hyogo, JP 64 402
Ueda, Yasutoshi Tokyo, JP 21 138

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00