Method of running-in operation of fuel cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10957925
APP PUB NO 20170338499A1
SERIAL NO

15420998

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

First, a reaction gas is supplied to a fuel cell stack including a laminate of solid polymer electrolyte fuel cells and power generation is performed so that a temperature of the fuel cell stack reaches 65° C. or higher (heating power generation step). Next, the reaction gas is supplied to the fuel cell stack and the power generation is performed under a condition in which relative humidity is 100% or more (cleaning power generation step). Cooling water of room temperature may be supplied to the fuel cell stack from the outside before the cleaning power generation step is performed after the heating power generation step is completed, or after the cleaning power generation step is completed (quenching step).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571
KABUSHIKI KAISHA TOYOTA CHUO KENKYUSHO41-1 YOKOMICHI NAGAKUTE-SHI AICHI-KEN 480-1192

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Manabu Susono, JP 195 3845
Kodama, Kensaku Nagakute, JP 6 4
Kusakari, Toshiaki Suntou-gun, JP 8 11
Murata, Hajime Nagakute, JP 13 157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00