Systems and methods for LNG production with propane and ethane recovery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10330382
APP PUB NO 20170336137A1
SERIAL NO

15158143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A LNG liquefaction plant includes a propane recovery unit including an inlet for a feed gas, a first outlet for a LPG, and a second outlet for an ethane-rich feed gas, an ethane recovery unit including an inlet coupled to the second outlet for the ethane-rich feed gas, a first outlet for an ethane liquid, and a second outlet for a methane-rich feed gas, and a LNG liquefaction unit including an inlet coupled to the second outlet for the methane-rich feed gas, a refrigerant to cool the methane-rich feed gas, and an outlet for a LNG. The LNG plant may also include a stripper, an absorber, and a separator configured to separate the feed gas into a stripper liquid and an absorber vapor. The stripper liquid can be converted to an overhead stream used as a reflux stream to the absorber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLUOR TECHNOLOGIES CORPORATION1 FLUOR DANIEL DRIVE SUGAR LAND TX 77478

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Graham, Curt Mission Viejo, US 29 482
Mak, John Santa Ana, US 116 2488
Thomas, Jacob Sugar Land, US 66 850

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00