Process for making pressure-sensitive adhesive and duct tape

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10329463
APP PUB NO 20170335148A1
SERIAL NO

15158675

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A continuous process for making a pressure-sensitive adhesive is disclosed. A mixture comprising natural rubber having a Mooney viscosity of 85 to 100, a tackifier, a filler, and 0.1 to 5 wt. % of an added C12-C24 fatty acid based on the amount of mixture is masticated in a first section of a single- or twin-screw extruder. Mastication of the mixture continues in at least one subsequent extruder section in the presence of additional tackifier. The product is a homogeneous, reduced-viscosity pressure-sensitive adhesive. The minor proportion of added C12-C24 fatty acid aids mastication of the rubber and enables high throughput without addition of peptizers. Duct tapes made from the adhesives display improved adhesion to steel, better adhesion bond strength, and enhanced seven-day clean removability from even difficult substrates such as marble or ceramic tile.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHURTAPE TECHNOLOGIES LLC1712 8TH STREET DR SE HICKORY NC 28602

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chou, Kevin Denver, US 16 146

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00