Preparation method and preparation device for silver-metal oxide electrical contact material and application of the material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10639722
SERIAL NO

15534194

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A preparation method for a silver-metal oxide electrical contact material, comprising: (1) mixing a silver-containing precursor solution with a metal oxide precursor solution; (2) reacting a reducing agent with the mixed solution to obtain silver powder coated with a metal oxide precursor; (3) heat treating the silver powder in a non-reducing atmosphere to obtain the silver-metal oxide electrical contact material. A preparation device for a silver-metal oxide electrical contact material, a silver-metal oxide electrical contact material prepared by the preparation method, and an electrical contact prepared by the silver-metal oxide electrical contact material. The electrical contact material prepared by the preparation method is at nanoscale, significantly prolonging electrical endurance of the electrical contact.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER ELECTRIC INDUSTRIES SAS35 RUE JOSEPH MONIER RUEIL-MALMAISON 92500

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lai, Yijian Shanghai, CN 5 6
Liu, Nan Shanghai, CN 105 1002
Zhao, Binyuan Shanghai, CN 5 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00