Assembly comprising brush cage and spiral spring, and corresponding brush-holder, electric motor and motor vehicle starter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10700485
APP PUB NO 20170331242A1
SERIAL NO

15533861

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates mainly to an assembly comprising a brush cage and a spiral spring (36), the spiral spring (36) comprising an axis (Y), a wound part (37) wound about the axis (Y) and an arm (39) extending from one end of the wound part (37), the brush cage comprising at least one lateral wall provided with an opening for the passage of the arm (39) through the lateral wall so that one end of the arm (39) can press against at least part of an end face of a brush, wherein the arm (39) comprises a first portion (391) of which the width (L5) measured along the axis (Y) is different from the width (L6) of the wound part (37) measured along the axis (Y) of the spiral spring (36).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VALEO EQUIPEMENTS ELECTRIQUES MOTEUR94046 CRÉTEIL CEDEX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bost, Alain L'isle d'abeau, FR 5 6
Gentil, Maximilien Corbas, FR 10 8
Mollon, Pierre Estrablin, FR 5 3
Nalin, Marie-Ange Chazey sur Ain, FR 5 1
Pays, Wilfried Sermerieu, FR 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00