Multi-stage compression and storage system for use with municipal gaseous supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10731794
APP PUB NO 20170328520A1
SERIAL NO

15665578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-stage gas compression, storage and distribution system utilizing a hydrocarbon gas from a municipal gaseous supply line in a manner that does not affect an operational integrity of said municipal gaseous supply line includes an inlet line fluidly in fluid communication with a supply of hydrocarbon gas at a first pressure, a first compression unit configured to compress the hydrocarbon gas from the inlet line to a second pressure, a first storage vessel configured to receive the hydrocarbon gas from the first compression unit for storage at the second pressure, a second compression unit configured to compress the hydrocarbon gas from the first storage vessel to a third pressure, and a second storage vessel configured to receive the hydrocarbon gas from the second compression unit for storage at the third pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CAPAT LLC3535 HIAWATHA AVENUE SUITE 304 MIAMI FL 33133

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cajiga, Jose A Miami, US 22 158
Villar, Arturo Cajiga Miami, US 17 158
Villar, Vincente Cajiga Miami, US 5 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00