Test equipment, method for operating a test equipment and computer program

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10768221
APP PUB NO 20170322252A1
SERIAL NO

15626050

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A test equipment has a signal input/signal output and a use-site calibration unit for determining a user-site compensation function. The user-site compensation function has a compensation magnitude function and a compensation Hilbert phase function. The calibration unit has a level meter and a calculator. The level meter is configured to measure a magnitude characteristic of the electrical signal, the magnitude characteristic being the basis for the determination of the compensation Hilbert phase function. The calculator is configured to determine a Hilbert phase characteristic of the electrical signal based on a Hilbert transformation of a function dependent on the measured magnitude characteristic and to determine the compensation Hilbert phase function on the basis of the Hilbert phase characteristic.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANTEST CORPORATION1-6-2 MARUNOUCHI CHIYODA-KU TOKYO 100-0005

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gross, Stefan Herrenberg, DE 48 398
Laquai, Bernd Stuttgart, DE 14 93
Müller, Detlef Renningen, DE 8 7
Martin, Ingolf Balingen, DE 1 0
Rosenkränzer, Alfred Herrenberg, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00