Nacelle rear assembly for a turbojet engine comprising a cradle for a core-type mast

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10641206
SERIAL NO

15654030

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a nacelle rear assembly for turbojet engine including at least one thrust reverser device to redirect air flow circulating from upstream to downstream in a flow path of the turbojet engine and a mast to link the nacelle to a structure of the aircraft. In one form, the nacelle extends longitudinally from forth to back along an axis and includes a cradle fastened on the mast. In one form, the cradle includes a first longeron and a second longeron extending longitudinally on either side of the mast. The first and second longeron each include a sliding guide device for sliding of a movable cowl and of a cascade of the thrust reverser device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN NACELLESROUTE DU PONT VII GONFREVILLE-L'ORCHER 76700

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boileau, Patrick Tournefeuille, FR 34 68
Gautier, Armel Negrepelisse, FR 1 11
Grall, Loïc Elancourt, FR 7 27
Kerbler, Olivier Antony, FR 31 153
Lezerac, Julien Toulouse, FR 3 16
Toupet, Ludovic Alfortville, FR 3 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00