Operating point determination in an electric motor system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10622870
APP PUB NO 20170317617A1
SERIAL NO

15189963

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are described for controlling an electric motor. An exemplary system may include a torque detector configured to detect an output torque of the electric motor. The system may also include a controller configured to control a voltage source to apply a predetermined voltage to drive the electric motor and determine an operating table containing a plurality of operating points. The controller may select an operating current value and generate a plurality of current commands. The controller may also apply each of the plurality of current commands to drive the electric motor and determine an output torque generated by the electric motor. The controller may further determine a target current command that generates a maximum output torque. In addition, the controller may determine an operating point of the operating table based on the target current command. Moreover, the controller may control the electric motor using the operating table.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FARADAY&FUTURE INC18455 S FIGUEROA ST GARDENA CA 90248

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Campbell, Mengwei Torrance, US 9 36
Grubic, Stefan Hermosa Beach, US 11 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00