Method for production of a female embossing tool, a female embossing tool, and an embossing module equipped therewith

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10618240
APP PUB NO 20170313018A1
SERIAL NO

15525102

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for production of a female embossing tool (6) intended for embossing a sheet element (60): provide a female embossing tool (6) with an outer layer (44) made of a material with shape-memory type properties, and the outer face of the layer has no recesses; provide a male embossing tool (5, 5′) with an outer face with at least one protuberance corresponding to at least one desired embossing relief that is to be formed on the sheet element (60) after embossing; and cooperation of the male embossing tool (5, 5′) with the female embossing tool (6) such that the outer layer (44) of the female embossing tool (6) undergoes a plastic deformation which creates at least one recess (42, 42′) of a shape complementary to the protuberance(s) (41, 41′) of the male embossing tool (5, 5′).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOBST MEX SAROUTE DE FARAZ 3 MEX 1031

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pessotto, Francesco Le Mont-sur-Lausanne, CH 3 4
Valterio, Roberto Ollon, CH 17 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00