3D-OBJECT PRODUCTION SYSTEM, 3D-OBJECT PRODUCTION DEVICE, LAYERING MEMBER, 3D OBJECT, 3D-OBJECT PRODUCTION METHOD, AND PROGRAM
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
N/A
app pub date -
Oct 29, 2015
filing date -
Nov 4, 2014
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A 3D-object production system equipped with a layering sheet or a reference 3D-formed object, and a 3D production device. The layering sheet is provided with information pertaining to the 3D object, and serves as a member used in the layering of the object. In addition, the reference 3D-formed object serves as a reference 3D object equipped with information pertaining to the 3D object. The 3D-object production device reads the 3D object information from the layering sheet or the reference 3D-formed object, and on the basis of the read 3D object information, layers and forms the 3D object.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
KEIO UNIVERSITY | 15-45 MITA 2-CHOME MINATO-KU TOKYO 108-8345 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
MASUDA, Tsuneo | Kanagawa, JP | 5 | 25 |
# of filed Patents : 5 Total Citations : 25 | |||
TANAKA, Hiroya | Kanagawa, JP | 46 | 387 |
# of filed Patents : 46 Total Citations : 387 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 4 Citation Count
- B29C Class
- 34.18 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | May 2, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | May 2, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
