Power converter and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10615702
APP PUB NO 20170310227A1
SERIAL NO

15483527

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control method of a power converter including a first stage converter and a second stage converter is provided. The first stage converter converts an input voltage into an intermediate voltage. The second stage converter converts the intermediate voltage into an output voltage to power a load. If a loading amount of the load is larger than a first threshold value, the intermediate voltage is adjusted to increase a voltage difference between the intermediate voltage and the output voltage, so that a change of the intermediate voltage is in a negative correlation with a change of the loading amount. If the loading amount is smaller than a second threshold value, the intermediate voltage remains be unchanged or the intermediate voltage is adjusted, so that the change of the intermediate voltage is in positive correlation with the change of the loading amount.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DELTA ELECTRONICS (SHANGHAI) CO LTD1F&7F&8F BUILDING 1 NO 1675 HUADONG ROAD PUDONG SHANGHAI 201209

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ye, Haoyi Shanghai, CN 40 183
Zeng, Jianhong Shanghai, CN 121 647
Zhang, Yu Shanghai, CN 1971 9206

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00