Motor with bus-bar assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10892658
APP PUB NO 20170310183A1
SERIAL NO

15517966

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclose herein is a motor. The motor includes a stator assembly that has a stator core, an upper insulator covering and insulating an upper portion of the stator core, and a lower insulator covering and insulating a lower portion of the stator core, and a bus-bar assembly that has a bus-bar having a plurality of connecting terminals formed on a circular bus and a contact portion electrically connected to a coil, and a bus-bar housing accommodating the bus-bar therein. The contact portion has a bent portion formed by bending distal ends of the connecting terminals upward, a contact piece located to face the bent portion, and a connection piece which connects the bent portion with the contact piece, and the bus-bar housing is coupled to a bus-bar seat defined in a central portion of the upper insulator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEW MOTECH CO LTD#270-65 OSEON-DONG GWANGSAN-GU GWANGJU 506-253

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jang, Jeong Cheol Gwangju, KR 83 319
Lee, Seong Jin Naju-si, KR 56 81
Seo, Je Hyung Gwangju, KR 13 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 12, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 12, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00