Method of generating electricity with a fuel cell; associated device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10026978
APP PUB NO 20170309934A1
SERIAL NO

15520704

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of generating electricity with a fuel cell includes a phase in which the cell is primed; and a phase in which the cell functions at a stable rate, during which the cell, fed with a hydrogenated gas, generates electricity and heat. In order to prime the cell, it is fed with a hydrogenated gas including at least 70 vol. % hydrogen, generated by self-sustaining combustion of at least one hydrogenated gas-generating solid pyrotechnic charge; and while it is operating at a stable rate, the cell is fed with a hydrogenated gas containing at least 85 vol. % hydrogen, generated by thermal decomposition of at least one hydrogenated gas-generating solid pyrotechnic charge; a portion of the heat produced by the operating cell being transferred to the at least one solid charge in order to start and maintain the thermal decomposition thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN POWER UNITSCHEMIN DU PONT DE RUPE TOULOUSE 31200

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boudjema, Fabien Garches, FR 1 0
Fournet, Arnaud Merignac, FR 5 9
Gautier, Philippe Le Plessis Pate, FR 22 475
Goudon, Jean-Philippe Maisons-Alfort, FR 3 3
Soulie, Laurent Bordeaux, FR 3 4
Yvart, Pierre Ballancourt sur Essonne, FR 9 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00