Method for producing a memory device having a phase change film and reset gate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10026893
APP PUB NO 20170309814A1
SERIAL NO

15647509

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a memory device includes depositing a second interlayer insulating film on a substrate, forming contact holes, and depositing a second metal and a nitride film. The second metal and the nitride film are removed to form pillar-shaped nitride layers, and to form lower electrodes surrounding the pillar-shaped nitride layers. The second interlayer insulating film is etched back to expose upper portions of the lower electrodes. The upper portions of the lower electrodes surrounding the pillar-shaped nitride film are removed and a phase change film is deposited to surround the pillar-shaped nitride film and connect with the lower electrodes. The phase change film is etched on upper portions of the pillar-shaped nitride film, and a reset gate insulating film is formed surrounding the phase change film and forming a reset gate having a side wall shape and remaining on the upper portions of the pillar-shaped nitride film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNISANTIS ELECTRONICS SINGAPORE PTE LTDSINGAPORE 179098

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masuoka, Fujio Tokyo, JP 412 6771
Nakamura, Hiroki Tokyo, JP 382 4527

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00