Measuring arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10641635
SERIAL NO

15513205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A measuring arrangement for determining flow velocity of at least one liquid phase and/or a gas phase of a vapor or a fluid composed of a liquid and a gaseous phase or a supercritical fluid, comprising a measuring tube, on or in which at least one sensor element of at least a first flow measuring device is arranged for measuring the liquid phase or the gas phase, wherein the measuring tube has at least an inflow region and an outflow region, wherein between these two regions a central region is arranged, whose measuring tube cross section has a greater area than the area of the measuring tube cross section of the outflow region or of the inflow region, and method for ascertaining flow of phases of a vapor or of a fluid composed of a liquid and a gaseous phase, or a supercritical fluid.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENDRESS + HAUSER FLOWTEC AGKAGENSTR 7 REINACH 4153

International Classification(s)

loading....
  • 2015 Application Filing Year
  • G01F Class
  • 1076 Applications Filed
  • 820 Patents Issued To-Date
  • 76.21 % Issued To-Date

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hocker, Rainer Waldshut, DE 20 165
Popp, Oliver Oberwil, CH 31 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • G01F Class
  • 0 % this patent is cited more than
  • 5 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges407420145101 - 1011 - 2021 - 3031 - 400255075100125150175200225250275300325350375400425450

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2031