Boiler system and method of operating same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10690344
APP PUB NO 20170307215A1
SERIAL NO

15138899

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Boiler systems and associated control systems, methods for operating same, are described herein. In one example embodiment, a boiler system includes a furnace, an exhaust passage, an air passage, a FGR passage, a flue gas valve that is adjustable by way of a first actuator, a NOX gas sensor, an oxygen gas sensor, and an additional valve that is adjustable by way of a second actuator. Further, the boiler system includes at least one processing device coupled to the NOX gas sensor, the oxygen gas sensor, the first actuator and the second actuator. The at least one processing device is configured to generate control signals that are provided to the first actuator and second actuator, and also configured to generate correction factors by way of a calibration process and to utilize one or more of the correction factors in determining one or more of the control signals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE CLEAVER-BROOKS COMPANY INC221 LAW STREET THOMASVILLE GA 31792

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aicher, Randy Todd Muskego, US 1 1
Tynkov, Boris M Bayside, US 5 38
Zala, Rakesh Germantown, US 7 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00