Process for producing light olefins

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10737991
APP PUB NO 20170305815A1
SERIAL NO

15520729

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a process for producing light olefins, the process comprising: continuously contacting an oxygen-containing compound raw material with catalyst to have a dehydration reaction so as to prepare low-carbon alkene, the reaction pressure P of the dehydration reaction being 1-2 MPa, and the weight hourly space velocity H of the dehydration reaction being 15-50 h−1. The process of preparing light olefins has a simple and continuous operation process, reduces investment, greatly increases production of light olefins and has a high safety.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA PETROLEUM & CHEMICAL CORPORATION22 CHAOYANGMEN NORTH STREET CHAOYANG DISTRICT BEIJING 100728 100728
RESEARCH INSTITUTE OF PETROLEUM PROCESSING SINOPEC100083 NO 18 HAIDIAN DISTRICT BEIJING XUEYUAN ROAD BEIJING CITY BEIJING CITY 100083

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Shouye Beijing, CN 10 41
Li, Minggang Beijing, CN 14 50
Tang, Jinlian Beijing, CN 4 24
Wang, Xin Beijing, CN 1487 14353
Xu, Youhao Beijing, CN 22 66
Yu, Jingchuan Beijing, CN 6 1
Zong, Baoning Beijing, CN 18 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00