Heterogeneous device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10777533
APP PUB NO 20170301656A1
SERIAL NO

15639194

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of integrating a first substrate having a first surface with a first insulating material and a first contact structure with a second substrate having a second surface with a second insulating material and a second contact structure. The first insulating material is directly bonded to the second insulating material. A portion of the first substrate is removed to leave a remaining portion. A third substrate having a coefficient of thermal expansion (CTE) substantially the same as a CTE of the first substrate is bonded to the remaining portion. The bonded substrates are heated to facilitate electrical contact between the first and second contact structures. The third substrate is removed after heating to provided a bonded structure with reliable electrical contacts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INVENSAS BONDING TECHNOLOGIES INC3025 ORCHARD PARKWAY SAN JOSE CA 95134

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Enquist, Paul M Cary, US 82 5302
Fountain, Gaius Gillman Youngsville, US 6 237

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00