Transition casting for boiler with steam cooled upper furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10253972
APP PUB NO 20170299172A1
SERIAL NO

15099192

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Transition castings are disclosed which comprise a steam tube and a water tube, which are joined together by membranes. A heat transfer fin extends from the membrane and abuts the water tube. The steam tube bends such that an upper end is on one side of the water tube, and a lower end is on an opposite side of the water tube. The transition castings are used in a transition section of a boiler in which the furnace is divided into a lower furnace and an upper furnace. The lower furnace uses water-cooled membrane walls, while the upper furnace uses steam-cooled membrane walls that act as superheating surfaces. The transition casting joins the lower furnace and the upper furnace together.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BABCOCK & WILCOX COMPANY20 SOUTH VAN BUREN AVENUE BARBERTON OH 44203

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bennett, Albert J Doylestown, US 6 3
Brewster, Kevin L North Canton, US 1 1
Detzel, Roger A Uniontown, US 12 49
Thayer, Steven D Minerva, US 4 3
Wells, Eric L Massillon, US 7 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00