GREEN PROCESS TO HYDROLYZE CARBOHYDRATES FROM TOBACCO BIOMASS USING SUBCRITICAL WATER
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
N/A
app pub date -
Jun 29, 2017
filing date -
May 7, 2013
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
Processes for recovering sugars and nicotine from a tobacco biomass include feeding a biomass of tobacco plants and subcritical water to a reactor, hydrolyzing the biomass of tobacco plants with the subcritical water at a temperature between about 150° C. and 305° C. and recovering a liquid product and a solid product from the reactor, wherein the liquid product contains water-soluble sugars and nicotine.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
TYTON BIOSCIENCES LLC | 300 RINGGOLD INDUSTRIAL PARKWAY DANVILLE VA 24540 |
International Classification(s)

- 2017 Application Filing Year
- C11B Class
- 277 Applications Filed
- 183 Patents Issued To-Date
- 66.07 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
BOBE, Iulian | Danville, US | 20 | 37 |
# of filed Patents : 20 Total Citations : 37 | |||
KUMAR, Sandeep | Virginia Beach, US | 286 | 3417 |
# of filed Patents : 286 Total Citations : 3417 | |||
MAJERANOWSKI, Peter | Danville, US | 8 | 22 |
# of filed Patents : 8 Total Citations : 22 | |||
MOSCOSO, Jose Luis Garcia | Norfolk, US | 2 | 6 |
# of filed Patents : 2 Total Citations : 6 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- C11B Class
- 0 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Apr 19, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Apr 19, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
