Structural component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11161320
APP PUB NO 20170291386A1
SERIAL NO

15471795

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structural component, in particular for an aircraft, spacecraft or rocket, has a ply of fiber reinforced polymer; a first carbon nanotube mat; and a metallic layer, wherein the carbon nanotube mat and the metallic layer are arranged on the ply of fiber reinforced polymer to form a hybrid lightning strike protection layer. A component for manufacturing such a structural component, a method for manufacturing a component of this type, a method for manufacturing a structural component and an aircraft or spacecraft with such a structural component are described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS DEFENCE AND SPACE GMBHWILLY-MESSERSCHMITT-STRASSE 1 TAUFKIRCHEN 82024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Karch, Christian Taufkirchen, DE 18 32
Lenczowski, Blanka Taufkirchen, DE 21 135
Wolfrum, Johannes Taufkirchen, DE 6 92
Yeshurun, Yehoshua Taufkirchen, DE 32 1482

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 2, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 2, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 2, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00