Subgrade peat stabilisation system for railway

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10344433
APP PUB NO 20170284031A1
SERIAL NO

15427311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ground stabilisation system is used for stabilising a subgrade region which includes a peat layer under a railway having rails supported across rail ties on a ballast layer over the subgrade region. The system uses a plurality of drain members submerged in an upright orientation within the peat layer of the subgrade region in which each drain member has a hollow interior and a plurality of openings therein which allow communication of fluid from the peat layer surrounding the drain member into the hollow interior of the drain member so as to be arranged to reduce fluid pressure in the peat layer when the peat layer undergoes dynamic loading from a passing train. Each drain member is a semi-rigid pipe having an axial stiffness greater than a dynamic stiffness of the peat layer to reduce loading on the peat layer under dynamic loading from a passing train.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TBT ENGINEERING LIMITED1918 YONGE STREET THUNDER BAY P7E 6T9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maki, Gordon C Thunder Bay, CA 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00