Method for forming sealing film, and sealing film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10793952
APP PUB NO 20170283951A1
SERIAL NO

15510845

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a sealing film, in which a buffer layer and a barrier layer whose density is higher than that of the buffer layer are alternately formed on a substrate, includes forming a first buffer layer on a surface of the substrate, forming a first barrier layer on a surface of the first buffer layer, and forming a second buffer layer on a surface of the first barrier layer. A ratio of a thickness of a portion of the first buffer layer in a thickness direction of the substrate relative to a thickness of a portion of the first buffer layer in an inclined direction that is inclined with respect to the thickness direction is closer to 1 than a ratio of a thickness of a portion of the second buffer layer in the thickness direction relative to a thickness of a portion of the second buffer layer in the inclined direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TORAY ENGINEERING CO LTDOSAKA JAPAN OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujimoto, Takayoshi Kusatsu, JP 11 27
Mori, Masaki Yasu, JP 153 985
Yamashita, Masamichi Otsu, JP 13 318

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 6, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00