Ta—Nb alloy powder and anode element for solid electrolytic capacitor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10329644
APP PUB NO 20170283916A1
SERIAL NO

15509290

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Ta—Nb alloy powder which provides a capacitor having a higher capacitance than a Ta capacitor and a better thermal stability in terms of an oxide film than a Nb capacitor, the Ta—Nb alloy powder being a Ta—Nb alloy powder produced by a thermal CVD method, wherein a content of Nb is 1 to 50 mass %, and an average particle diameter of primary particles is 30 to 200 nm, preferably, a CV value per unit mass of the powder (μF·V/g) is 250 kμF·V/g or more, or further, a CV value per unit volume (μF·V/mm3) in terms of a molded body whose molding density ρ (g/cm3) is ρc (g/cm3)=−0.012RNb+3.57, wherein RNb:Nb content (mass %) in an alloy, is 900 μF·V/mm3 or more, and an anode element for a solid electrolytic capacitor using the alloy powder.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ISHIHARA CHEMICAL CO LTDKOBE CITY HYOGO HYOGO DISTRICT XILIU HARAMACHI 5 NO 26

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furutani, Jun Takashima, JP 1 1
Kondo, Tsukasa Tsuruga, JP 29 44
Maeshima, Takayuki Akashi, JP 2 46
Sakai, Hisakazu Akashi, JP 6 66
Satoh, Issei Kobe, JP 33 156
Takata, Yoshihiko Kobe, JP 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00